How long will your single-storey rear extension actually take?
A rear addition on the ground floor — typically a kitchen-diner, family room or extended living space. Build on site is usually 12–16 weeks for a 20–30 m² extension, but the full project from design to handover runs 9–12 months once you factor in drawings, planning, building regs, tender and steel/glazing lead times.
Single-Storey Rear Extension
A rear addition on the ground floor — typically a kitchen-diner, family room or extended living space. Build on site is usually 12–16 weeks for a 20–30 m² extension, but the full project from design to handover runs 9–12 months once you factor in drawings, planning, building regs, tender and steel/glazing lead times.
Your timeline
On-site only. Add ~26 weeks of pre-construction (planning, ordering, lead times) before day 1.
Where it tends to slip
If your project goes long, it’ll usually be one of these. Worth knowing before you sign anything.
Trades you’ll need
All listed on TradesAround. No paid placements, no sponsored bumps.
- General Builder
- Groundworker
- Bricklayer
- Structural Builder
- Carpenter
- Roofer
- Window Fitter
- Plumber
- Electrician
- Plasterer
- Tiler
- Painter & Decorator
- Building Control
- Architect
- Structural Engineer
- Party Wall Surveyor